Click here to see shortcuts

South Shore Corridor Project

Project Status

Construction is underway!

Visit the construction website to find information about construction phasing, planned activities, lane closures, stoppages and general traffic updates. You can also sign-up for traffic updates and view more information about the project in the Information Centre.

Port Metro Vancouver is committed to maximizing predictability during the construction period and minimizing disruption for Port tenants, Port users, nearby residents and the community. This site will be updated regularly. If you require further information, please contact us.

Read the latest construction update here.

 

Project overview

The South Shore Corridor Project is designed to enhance port operations and provide for future rail capacity improvements as international trade continues to grow.

The project is bounded by Heatley Avenue and McGill Street along Vancouver’s south shore, and is one of two high priority trade area projects identified by Port Metro Vancouver, the City of Vancouver, and Transport Canada. 

South Shore Corridor Project Map

Project scope

While most of the South Shore Corridor Project will involve improvements on port lands, one of the project objectives is to reduce the effects of port operations on local streets as trade continues to grow.

Key elements of the project include:

  1. A new Stewart Street Elevated Road between Clark Drive and Victoria Drive. This new road provides an alternate route for through-traffic, significantly reducing congestion along Stewart Street and improving travel time reliability.
  2. A new Pedestrian Overpass at Victoria Drive, providing safe access for port workers over the rail tracks at Victoria Drive. The overpass will reduce train switching noise in this location.
  3. Realigned Commissioner Street to facilitate long term improvements to rail capacity and reduce train-related noise.
  4. Intersection and roadway improvements on Stewart Street, Centennial Road and Commissioner Street to better manage truck access and egress at: 4A - Heatley Avenue, 4B - Clark Drive, 4C - McGill Street.
  5. Reconfigured New Brighton Road to provide access to port land for potential truck staging to manage traffic flow and reduce corridor-wide congestion. Access to New Brighton Park remains unchanged.
  6. Corridor-wide improvements including upgraded signage, installation of Intelligent Transportation Systems (ITS) and fibre optic cable upgrades.

Learn more

Learn more

On portmetrovancouver.com

Sign-up for project updates 









Contact information

Public Affairs

Work 604.665.9066
Fax 1.866.284.4271

Address

100 The Pointe, 999 Canada Place
VancouverBC  V6C 3T4
Back to Home

Please Upgrade Your Browser

This site's design is only visible in a graphical browser that supports web standards, but its content is accessible to any browser or Internet device.